Dairy Plant Ltd. in Laszczow
The project was implemented in the first quarter of 2008. Recuperator 812kW power was installed and mounted on the exhaust outlet in the coal boiler OR5/16. In the design were used the copper heat pipes with aapproximately 2 metres of length and 25 millimetres of diameter. More than 800 pipes were mounted in diagonal position.
Read more
Arctic Paper Kostrzyn Inc.
The company is the largest manufacturer of offset papers in Poland and the second largest producer of graphic papers. The first recuperator was mounted at the turn of 2010 and 2011 — the new system has been enabled in January 2011. Power of recuperator is 4.7 MW and was installed on the gas boiler run in conjunction with energy generating turbine.
Read more
Municipal heat station, Regio Kormend, Hungary
The project in Hungary has been carried out in 2009 in the local heat station. The installation of Q-Box 100 managed to reduce the exhaust gas temperature of more than 40 ° c. The power of the device is 116 kW, hence the payback of invested money was 10 months.
Read more
Azomures, Tîrgu-Mures, Romania
Azomureş is the most significant producer of chemical fertilizers for agriculture in Romania. EnergiQ mounted the recuperatorsin the factory in the period of 2002-2004. As a result, their mounted 6 recuperators on each chimney with power rating: 5 x 1.16 MW and one with a 2 MW power. The project assumed a recovery of exhaust gases and their reuse for steam production.
Read more